Why we quote before the brief — and do not regret it
A price range on the first call filters out the wrong projects before either side spends a week on a brief.
Placeholder text. Replace it in the admin panel before publishing: Content → Blog.
How this works in practice
Two or three paragraphs of the actual argument go here, with a number in each one where possible.
- First point
- Second point
- Third point
A short line worth remembering.
Read next
What a website costs in Europe in 2026: the quote, line by line
What goes into the price of a website, which lines of a quote are time and which are risk, and why two proposals for the same job differ by a factor of three.
First‑screen checklist: 12 questions before design
Twelve questions we answer before anyone opens a design tool. Skip them and the first screen gets redrawn four times.